IPp3 Carbon Assessment
Use the carbon assessment that USGBC provides from project data to understand a 25-year projection of operational, refrigerant, and embodied emissions.1
- Points
- Required
- Applies to
- BD+CID+C
Reviewed · Spot an error? Report it
Points
Required for NC and Core and Shell; no points. The assessment horizon is 25 years.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- EAp1 operational-carbon projection and decarbonization plan
- EAp5 refrigerant inventory and calculations
- MRp2 embodied-carbon inventory and assessment
- LTc4 transportation assessment, if included
- USGBC project carbon assessment output
Worked example
Assume inputs are prepared for EAp1, EAp5, and MRp2. That is 3 required input groups; adding LTc4 makes 4 groups but does not create an extra point. The actual 25-year projection must use the USGBC assessment methodology, not a simple multiplication of one annual total by 25.1
Requirements
The assessment draws on EAp1 Operational Carbon Projection and Decarbonization Plan, EAp5 Fundamental Refrigerant Management, and MRp2 Quantify and Assess Embodied Carbon. LTc4 transportation data is optional. The assessment combines those inputs; it does not replace the underlying prerequisites.1
FAQ
Is transportation data mandatory for this prerequisite?
The listed LTc4 contribution is optional; the other three referenced prerequisites supply the required data.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 BD+C Rating SystemJuly 2026 · IPp3, printed pp. 10