EAp1 Operational Carbon Projection and Decarbonization Plan
Analyze design measures early, estimate annual site energy by source, review the 25-year carbon projection, and establish a decarbonization route.1
- Points
- Required
- Applies to
- BD+C
Reviewed · Spot an error? Report it
Points
Required for NC and Core and Shell; no points. All four components apply; the decarbonization plan component has two alternative paths.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Early design alternatives and energy-analysis memo
- Annual site-energy estimate by source and by end use (space heating, service hot water, cooking, cooling, refrigeration, ventilation, plug and process loads, other)
- USGBC BAU carbon projection and owner review attestation
- Applicable BPS ordinance projection/cap/fee analysis
- EAc1 achievement evidence or two-page decarbonization plan and owner attestation
Worked example
Assume annual site-energy inputs of 800 MWh electricity and 200 MWh fuel. Total site energy is 1,000 MWh, but the two source amounts must stay separate because their carbon factors and future changes differ. Multiplying 1,000 MWh by one fixed factor for 25 years does not reproduce the required projection.1
Requirements
Use simplified modeling, comparable projects, or published data to inform early efficiency, peak-load, and decarbonization decisions. Submit annual site-energy estimates by type for USGBC's business-as-usual projection. Where a carbon-based building performance standard applies, also prepare the ordinance-specific projection, caps, and relevant annual/cumulative fees, with owner review.1
For the decarbonization component, earn 4 or 5 EAc1 points or prepare an owner-reviewed narrative no longer than two pages describing 25-year retrofits, approximate timing/costs, discarded/replacement equipment and materials, and readiness measures with avoided cost, disruption, and waste. Core and Shell planning considers tenant build-out and later retrofits.1
FAQ
Does a decarbonization plan replace the energy estimate?
No. The design analysis, source-specific estimate, projection review, and decarbonization component are separate required elements.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 BD+C Rating SystemJuly 2026 · EAp1, printed pp. 75-77