Credit Innovation

Use eligible innovation, pilot and exemplary-performance strategies within the stated mix.1

Points
Up to 5
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
INc1

Reviewed · Spot an error? Report it

Points

Up to 5 points across the permitted strategies and combination rules.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Strategy-specific intent, measurable requirements, approach and evidence.
  • Preparation checklist: Pilot registration/achievement and official exemplary-threshold evidence where used.

Worked example

Assume two approved innovation strategies, one achieved pilot and two eligible exemplary-performance achievements. The mix is 2+1+2=5, includes innovation and pilot, and stays within the two-exemplary cap. Approval and full strategy evidence are assumed, not established by the arithmetic.1

Requirements

An innovation strategy must produce significant measurable environmental performance outside the rating system, with intent, requirements, submittals and design approach defined. Pilot points require achievement of eligible official pilot credits. Exemplary points require an existing credit that explicitly permits exemplary performance.1

To earn all five points, include at least one innovation and one pilot, with no more than two exemplary-performance points. Do not assume every threshold can be doubled for an exemplary point.1

FAQ

Can five exemplary-performance claims earn all five?

No. At most two exemplary points count, and five-point achievement requires innovation and pilot participation.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Innovation; printed and PDF pp. 76

Maintained by VERTIQ, LEED software for consultants.