Credit Renewable Energy Production
Allocate eligible tenant renewable production and compare it with the project energy metric.1
Reviewed · Spot an error? Report it
Points
1, 2 or 3 points at 1%, 3% or 5% eligible renewable contribution.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: System generation estimate, project annual metric and tenant allocation.
- Preparation checklist: Ownership/lease, utility-service-area and environmental-attribute documentation.
Worked example
Assume the original cost route has $100,000/year project energy cost and $3,000/year equivalent eligible renewable production allocated to the tenant. The ratio is 3%, the 2-point threshold, provided ownership, benefits and allocation conditions are satisfied.1
Requirements
The original route compares equivalent cost of usable renewable energy with annual project energy cost, using the energy model or CBECS estimate. A solar garden or community system requires ownership or a lease of at least ten years and location in the same utility service area; claim only the assigned ownership/use share. An on-site system owned by a third party needs an agreement of at least ten years, and the project owner must retain all environmental benefits of the renewable energy.13
For the 2024 Update energy pathway, the Renewable Energy Production metric must match Optimize Energy Performance Table 1: cost or source energy. On-site and off-site/community contributions have different treatment in energy-performance accounting; do not count off-site/community generation toward the prerequisite.2
FAQ
Can the tenant claim the entire shared array?
Only the documented ownership or lease-assigned use share can contribute.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Renewable Energy Production; printed and PDF pp. 34
- USGBC LEED v4 ID+C Optimize Energy Performance (2024 Update)2024 Update; current online language checked October 28, 2026 · Option 1 Tenant-Level Energy Simulation; Tables 1 and 2 and notes
- LEED v4 Reference Guide for Interior Design and Construction AddendaCumulative through February 20, 2026 · PDF p.25, January 5, 2018 corrections to Further Explanation and Required Documentation
Maintained by VERTIQ, LEED software for consultants.