Credit Cooling Tower Water Use

Optimize cooling-tower cycles using measured makeup-water chemistry, with higher achievement paths for treatment or recycled water.1

Points
1 to 2 points
Applies to
BD+C
VERTIQ reference ID
WEc3

Reviewed · Spot an error? Report it

Points

1-2 points. The higher achievement alternatives do not add to the first point beyond the 2-point cap.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Potable makeup-water analysis results and narrative
  • Cooling-tower cycles and blowdown calculation
  • Water treatment calculations where the treatment path is used
  • Nonpotable water calculations where the recycled-water path is claimed

Worked example

Assume a documented chemistry evaluation sets the limiting allowable ratio at 5 and the tower operates at 5 cycles without exceeding limits. It supports the basic cycle path; 20% recycled makeup could support the alternative 2-point path if all conditions are met.1

Requirements

Analyze potable makeup water for the five listed parameters. For each parameter, divide the allowed condenser concentration by its measured makeup concentration and use the limiting result to protect operation. The basic path reaches the maximum allowable cycles up to ten; the higher path reaches at least ten using treatment or combines the basic path with at least 20% recycled nonpotable water.1

FAQ

Can the operator select the highest ratio among the parameters?

No. Avoid exceeding any parameter limit; the most restrictive condition controls.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Cooling Tower Water Use, printed/PDF pp. 59-60