Credit Green Vehicles

Provide green-vehicle preference and qualifying fueling infrastructure, with separate School and Warehouse paths.1

Points
1 point
Applies to
BD+C
VERTIQ reference ID
LTc8

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Parking and signage plans
  • EV charger/fueling-equipment specifications
  • Green-vehicle eligibility or discount policy
  • Fleet documentation for adaptation-specific paths

Worked example

Assume 200 parking spaces and use the standard EV path. Green-vehicle preference requires 200 x 5% = 10 spaces and EVSE requires 200 x 2% = 4 additional spaces, with the specified charger capability and controls.1

Requirements

For the standard path, dedicate 5% of project parking to qualifying green vehicles or provide the permitted rate discount. Also provide qualifying EV charging in 2% of parking or the alternative fueling option. EV charging spaces are additional to preferred green-vehicle spaces. Schools and Warehouses have distinct fleet/transport provisions.1

FAQ

Can the same four charging spaces replace all preferred spaces?

No. The standard path specifies EVSE spaces in addition to the preferred green-vehicle allocation.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Green Vehicles, printed/PDF pp. 27-29

Maintained by VERTIQ, LEED software for consultants.