Credit Green Vehicles
Provide green-vehicle preference and qualifying fueling infrastructure, with separate School and Warehouse paths.1
- Points
- 1 point
- Applies to
- BD+C
- VERTIQ reference ID
- LTc8
Reviewed · Spot an error? Report it
Points
1 point.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Parking and signage plans
- EV charger/fueling-equipment specifications
- Green-vehicle eligibility or discount policy
- Fleet documentation for adaptation-specific paths
Worked example
Assume 200 parking spaces and use the standard EV path. Green-vehicle preference requires 200 x 5% = 10 spaces and EVSE requires 200 x 2% = 4 additional spaces, with the specified charger capability and controls.1
Requirements
For the standard path, dedicate 5% of project parking to qualifying green vehicles or provide the permitted rate discount. Also provide qualifying EV charging in 2% of parking or the alternative fueling option. EV charging spaces are additional to preferred green-vehicle spaces. Schools and Warehouses have distinct fleet/transport provisions.1
FAQ
Can the same four charging spaces replace all preferred spaces?
No. The standard path specifies EVSE spaces in addition to the preferred green-vehicle allocation.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Green Vehicles, printed/PDF pp. 27-29
Maintained by VERTIQ, LEED software for consultants.