Credit Demand Response
Enable demand shedding or shifting with a qualified program or prepare for future participation.1
- Points
- 1 to 2 points
- Applies to
- BD+C
- VERTIQ reference ID
- EAc4
Reviewed · Spot an error? Report it
Points
| Points | Requirement |
|---|---|
| 2 | Qualified participation |
| 1 | The no-program infrastructure path |
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- DR provider agreement or utility correspondence
- Peak-demand estimate
- Load-shed and control-sequence plan
- Meter/control specifications and commissioning test
Worked example
Assume estimated peak demand is 1,000 kW. The participation commitment must cover at least 1,000 x 10% = 100 kW, supported by the DR plan and tested capability.1
Requirements
Where a program is available, enroll for at least one year with multiyear renewal intent and commit at least 10% of estimated peak electricity demand. Provide external-signal capability, a DR plan and commissioning including a full test. Without a program, provide the specified interval metering, control capability, a plan to shed at least 10% of estimated peak electricity demand, commissioning including a full test, and utility contact. On-site generation alone does not meet the credit intent.1
FAQ
Can a backup generator alone satisfy Demand Response?
No. The credit is directed at demand shedding or shifting; on-site generation alone does not meet its intent.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Demand Response, printed/PDF pp. 78