Credit Material Ingredients

Document product chemical inventories and qualifying ingredient optimization under separate ID+C product-count options.1

Points
Up to 2
Applies to
ID+CBD+C
VERTIQ reference ID
MRc5

Reviewed · Spot an error? Report it

Points

PointsRequirement
1Option 1 ingredient reporting
1Option 2 optimization
2Maximum

1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Completed LEED v4.1 MR building product calculator, with Verified for LEED Documentation ID numbers for GBCI-verified products, or full inventory reports showing reporting thresholds and verification. Reports must be valid when the product was purchased.
  • Preparation checklist: For Option 2, executive action plans or verified screening/optimization assessments, plus REACH or local-distance evidence if claimed.

Worked example

Assume four distinct Option 1 products have qualifying third-party inventory verification and four have qualifying unweighted inventory reports. Count = 4 x 1.5 + 4 x 1 = 10 across three manufacturers. That meets the reporting point. An extra optimization point requires the separate Option 2 report and count; a product name or disclosure label alone is insufficient.1

Requirements

Option 1 requires at least 10 different permanently installed products from at least three manufacturers using an accepted reporting program to at least 1,000 ppm. Examples include qualifying HPDs, Declare labels, Cradle to Cradle documentation and manufacturer inventories, subject to each program criteria. Reports with third-party verification of content inventory count as 1.5 products, except Global GreenTag Product Health Declaration labels, which the Guide values at 1 product under Option 1.1

Option 2 requires at least five weighted qualifying products from at least three manufacturers with a compliant ingredient report or action plan. An executive-signed screening/optimization action plan is worth 0.5 product. Third-party verified advanced inventory/assessment is worth 1 product, and third-party verified material-ingredient optimization is worth 1.5, with the detailed 100 ppm inventory, hazard-screen and assessment conditions; the international alternative is worth 1 product.1

For advanced assessment, use the stated no-GreenScreen-LT1/GHS-Category-1 route or the alternative at least 75%-assessed route with the remaining inventory and public assessment. For 1.5-product optimization, at least 95% is GreenScreen-assessed without BM-1 hazards, and the remaining inventory/screen meets the stated limits. The international REACH alternative is limited to projects outside the United States. Eligible three-stage local sourcing doubles contribution up to two products. Include in-scope furniture and furnishings.1

FAQ

Does any HPD automatically count as optimization?

No. Reporting and optimization have different conditions. The relevant HPD must satisfy the selected path assessment and verification criteria.1

Is the international REACH path available to a US project?

No. The Guide identifies that alternative for projects located outside the United States.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 Interior Design and Construction GuideNovember 2025 · Material Ingredients, printed/PDF pp. 118-131; ID+C scorecard printed/PDF pp. 5-6

Maintained by VERTIQ, LEED software for consultants.