Credit Outdoor Water Use Reduction
Reduce peak-month landscape irrigation demand beyond the prerequisite or avoid permanent irrigation.1
Reviewed · Spot an error? Report it
Points
| Points | Requirement |
|---|---|
| 1 | 50% reduction |
| 2 | 100% |
Core and Shell earns 1/2/3 at 50/75/100%. Healthcare has a 1-point maximum. No permanent irrigation earns the relevant maximum.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Landscape/irrigation plans
- WaterSense budget and peak-month calculation
- Alternative-water availability and quality records where used
Worked example
Assume an NC project's peak-month baseline is 200 m3, its efficient landscape needs 140 m3 and 40 m3 of that is supplied by a documented alternative source. Potable demand is 100 m3, giving 50% reduction and 1 point; the initial efficiency reduction is 30%.1
Requirements
The no-irrigation route has a maximum two-year establishment period. The reduced-irrigation route first obtains the prerequisite's 30% saving from plants and irrigation efficiency; additional saving may use alternative water and smart scheduling. Calculate peak-month reduction using the WaterSense method and apply the adaptation's point column.1
FAQ
Does a 75% NC reduction earn a second point?
The general BD+C table awards its second point at 100%; 75% is a separate intermediate threshold for Core and Shell.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 57-58
Maintained by VERTIQ, LEED software for consultants.