Credit Rainwater Management

Retain runoff on site through low-impact development and green infrastructure.1

Points
See below
Applies to
BD+C
Other versions
v4v5
VERTIQ reference ID
SSc4

Reviewed · Spot an error? Report it

Points

1-3 points; Healthcare 1-2. Natural-land-cover route awards 3 points, or 2 for Healthcare.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Local rainfall dataset and percentile calculation
  • Runoff/hydrology model
  • LID/GI design and retention-volume schedule
  • Narrative confirming measures qualify as LID or GI, plus natural land cover documents (Option 2) or zero lot line description, if used

Worked example

Assume an NC site's 85th-percentile rainfall generates a calculated 120 m3 target runoff volume. Documented infiltration of 80 m3 plus collection/reuse of 40 m3 totals 120 m3, meeting that volume for the 2-point route, subject to valid hydrology and retention design.1

Requirements

Use the rainfall-percentile route or retain the increased runoff between proposed and natural land-cover conditions. Retention means infiltration, evapotranspiration or collection and reuse, rather than detention followed by discharge. General-site percentiles of 80/85/90 correspond to 1/2/3 points; zero-lot-line thresholds are 70/75/80. Healthcare stops at 2 points.1

FAQ

Does a detention tank with eventual discharge meet retention by itself?

The requirement is retention by infiltration, evapotranspiration or reuse; delayed discharge alone does not establish it.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.