Credit Regional Priority

Earn extra points for achieving credits designated as priorities in the project's actual region.1

Points
Up to 4
Applies to
BD+CID+C
Other versions
v4
VERTIQ reference ID
RPc1

Reviewed · Spot an error? Report it

Points

Up to 4 additional points, one per achieved designated priority. Regional credits vary by location.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation suggestion: USGBC regional-priority lookup for project location/version
  • Preparation suggestion: Underlying credit compliance/award evidence
  • Preparation suggestion: Regional bonus tracking worksheet

Worked example

Assume the project's verified geographic list contains six priorities and the project achieves three of them. The regional bonus is 3 x 1 = 3 points, in addition to the earned underlying credits and within the four-point cap.1

Requirements

Use USGBC's geographic Regional Priority list for the project's rating system and location. Six credits are designated, and up to four achieved priorities can earn one additional point each. The underlying credit must be achieved. The actual priority list cannot be inferred from a global generic credit page.1

FAQ

Are the same six priority credits used worldwide?

No. Geographic applicability must be checked for the actual project.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 146

Maintained by VERTIQ, LEED software for consultants.