Credit Grid Harmonization
Prepare and test demand response or implement qualifying load flexibility.1
- Points
- Up to 2
- Applies to
- BD+C
- VERTIQ reference ID
- EAc4
Reviewed · Spot an error? Report it
Points
Up to 2 points. Participation can earn 2, a capable building 1, and qualifying load strategies 1 each within the credit maximum.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Utility/program provider agreement or correspondence
- Annual load profile and response/flexibility analysis
- Controls/meter specifications and response plan
- Commissioning test and operations-manual records
Worked example
Assume the applicable annual on-peak demand is 500 kW. The participation commitment must cover at least 50 kW: 500 x 10%. A 50 kW generator alone is not equivalent to load shedding/shifting under this credit.1
Requirements
Participation requires a qualified provider, a minimum one-year commitment for at least 10% of annual on-peak electricity demand, controls, a response plan and testing. The demand-response-capable route prepares for future participation, including utility contact and a 10% shedding plan. Load-flexibility strategies coordinate the building's annual/peak load with the regional grid profile and can use peak optimization or storage. All routes require the applicable metering, controls, commissioning and operations information.1
FAQ
Can on-site generation alone satisfy the credit?
The credit states that on-site electricity generation does not meet its load-shedding or shifting intent.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.